I am looking for some sample code that would show how to do a 3 conveyors merging onto one. Each of the three conveyors has a brake belt and a speed belt right before it hits the merge belt. I am using logix 5000. I have tried to create a traffic control sequence in the past but have not had much luck doing so. Any help would be appreciated. Thanks.
↧